Deck Framing Calculator — Joist Spacing, Beam Size & Lumber Takeoff
Enter deck dimensions to get joist count, beam size, post count, decking boards, and a full hardware list. The 6-step selection SOP below walks you from raw measurements to a ready-to-order takeoff, with each step verified against IRC DCA-6 prescriptive deck guidelines and the span tables on this page.
What makes this deck framing calculator different
The homepage wall framing calculator and the 2×4 / 2×6 / 2×12 calculator pages all compute vertical wall studs or interior floor joists. This page computes horizontal deck framing — exterior joists that span from a ledger to a beam, beams that span between posts, posts that carry the load to footings, and decking that covers the surface. The components (joists, beams, posts, decking, hardware), the load path (ledger → joist → beam → post → footing), and the governing code (IRC DCA-6 Prescriptive Residential Deck Construction Guide) are entirely different from wall framing. No other page on this site covers deck framing.
Deck Framing Selection SOP — 6 Decision Steps
Professional deck builders follow a strict 6-step decision sequence. Skipping any step produces a takeoff that is either over-budget (oversized joists) or unsafe (undersized beam). Each step below shows the metric you measure, the decision you make, and the verification that confirms the choice. Steps marked Decision Point require a sizing choice; steps marked POC Stage require verification against a span table or load table.
Measure Deck Dimensions
Decision PointMeasure the deck footprint (length × width) along the ledger and out to the rim joist. Record the joist span (distance from ledger to beam) and the beam span (distance between posts) separately — they drive different sizing.
Deck: 12×16 ft · Joist span: 12 ft · Beam span: 8 ftSelect Joist Size & Spacing
POC StageStep 2: Measure the joist span from the ledger to the beam. If span > 12 ft, choose 2x10 or 2x12 joists at 16" O.C. If span ≤ 12 ft, 2x8 at 16" O.C. is adequate. If span > 16 ft, add a mid-span beam to break the run. Verify against the joist span table below.
Joist: 2x10 @ 16" O.C. · Span capacity: 13'-6" (SPF)Size the Beam
Decision PointStep 3: Size the beam based on the joist span it supports and the post spacing. A 2-ply 2x10 beam spans 8 ft between posts under typical deck load; a 2-ply 2x12 spans 12 ft. If the beam span exceeds 12 ft, add another post or upgrade to a 3-ply beam. Verify the beam can carry the cumulative joist reaction.
Beam: 2-ply 2x10 · Post spacing: 8 ft · Load: 1,050 lb/ftCalculate Post & Footing Count
POC StageStep 4: Calculate posts from beam span (beam length ÷ post spacing + 1). For a 16 ft beam at 8 ft post spacing: 3 posts. Footings go under each post — diameter depends on soil bearing capacity (12" for 2,000 psf soil, 16" for 1,500 psf). Verify the footing can carry the tributary load.
Posts: 3 · Footings: 3 × 12" dia × 48" deepEstimate Decking & Hardware
Decision PointStep 5: Calculate decking coverage (5/4×6 boards at 16" O.C. = ~7.3 boards per 100 sq ft with gap). Add hardware: joist hangers (2 per joist at beam), post bases (1 per post), hurricane ties (1 per joist at ledger), and lag screws for the ledger. Verify all hardware is hot-dipped galvanized or stainless.
Decking: 117 boards · Hangers: 24 · Post bases: 3 · Ties: 12Final Takeoff & Cost Estimate
POC StageStep 6: Sum all material quantities, add 15% waste, and convert to cost. Verify the total against your budget. If over budget, the most impactful trade-off is reducing deck size by 2 ft in the joist-span direction (cuts joists, beam, posts, and footings proportionally).
Total: $2,840 material · 15% waste · Final: $3,266Interactive Deck Framing Verification Checklist
Before ordering lumber, confirm each item below. The progress bar at the top of the calculator updates as you check items off. Items left unchecked are the most common causes of deck inspection failures and rework.
Deck Joist Span Table (Southern Pine, SPF, Hem-Fir)
Maximum deck joist spans under 40 psf live load + 10 psf dead load (IRC DCA-6 Table 2). Southern Pine #2 spans the farthest because of its high bending strength; SPF spans ~10% less. The most common deck joist is 2×10 @ 16″ O.C. Southern Pine, which spans 15′-10″ — enough for most residential decks. For spans over 16 ft, switch to 2×12 or add a mid-span beam. Bolded rows are the recommended default for most decks.
| Joist Size | Species | 12" O.C. | 16" O.C. | 24" O.C. |
|---|---|---|---|---|
| 2x6 | Southern Pine #2 | 10'-10" | 9'-9" | 8'-0" |
| 2x8 | Southern Pine #2 | 14'-0" | 12'-6" | 10'-2" |
| 2x10Best | Southern Pine #2 | 17'-9" | 15'-10" | 13'-0" |
| 2x12 | Southern Pine #2 | 21'-6" | 18'-10" | 15'-5" |
| 2x6 | SPF #2 | 9'-2" | 8'-3" | 6'-9" |
| 2x8 | SPF #2 | 11'-10" | 10'-7" | 8'-8" |
| 2x10 | SPF #2 | 15'-0" | 13'-5" | 11'-0" |
| 2x12 | SPF #2 | 18'-2" | 16'-10" | 13'-9" |
| 2x8 | Hem-Fir #2 | 12'-6" | 11'-2" | 9'-2" |
| 2x10 | Hem-Fir #2 | 15'-10" | 14'-2" | 11'-7" |
Spans in feet-inches. Based on IRC DCA-6 Table 2, 40 psf live load. Verify against your local code — some jurisdictions require 50 psf for decks.
Deck Beam Selection Table
Deck beam size depends on the deck type (single-span, cantilever, or double-span), the joist span it supports, and the post spacing. A 2-ply 2×10 beam at 8 ft post spacing is the residential standard — it carries 1,200 lb/ft, enough for a 12 ft joist span at 16″ O.C. For cantilever decks, the beam sits 2 ft inside the rim joist, and capacity drops ~20% because the load path changes. Flush beams (joists hung off the side) always have less capacity than dropped beams.
| Deck Type | Beam Size | Max Post Spacing | Load Capacity | Notes |
|---|---|---|---|---|
| Single-span (joists bear on beam)Decision | 2-ply 2x8 | 6'-0" | 780 lb/ft | Small decks ≤10 ft joist span |
| Single-span (joists bear on beam)Decision | 2-ply 2x10 | 8'-0" | 1,200 lb/ft | Standard 12 ft joist span |
| Single-span (joists bear on beam) | 2-ply 2x12 | 12'-0" | 1,560 lb/ft | Large 14-16 ft joist span |
| Cantilever (joists overhang beam) | 2-ply 2x10 | 8'-0" | 980 lb/ft | Cantilever ≤2 ft; beam set back 2 ft from rim |
| Double-span (beam at mid-span) | 2-ply 2x10 | 10'-0" | 1,400 lb/ft | Splits joist run; allows smaller joists |
| Flush beam (joists hang off side) | 2-ply 2x12 | 10'-0" | 980 lb/ft | 20% less capacity than dropped beam; verify hanger ratings |
Deck Post Count & Footing Spacing
Posts transfer the beam load to concrete footings. Post count = (beam length ÷ post spacing) + 1. For a 16 ft beam at 8 ft spacing: 3 posts. Each post sits on a footing whose diameter depends on soil bearing capacity: 12″ diameter for 2,000 psf soil (carries ~3,140 lb), 14″ for 1,500 psf soil (~3,850 lb). Footing depth must extend below the frost line — 36″ in Zone 5, 48″ in Zone 6, 48″+ in Zone 7. The calculator above computes post count from your beam length and post spacing inputs.
Decking Coverage Calculation
Decking coverage depends on board width, gap, and material. All 5.5″-wide boards (5/4×6, 2×6, composite, IPE) need about 7.3 boards per 100 sq ft with a 1/4″ gap. Narrower 2×4 decking (3.5″ width) needs 11.4 boards per 100 sq ft. Always add 15% waste for cuts, culls, and board-end defects. The calculator above uses 5/4×6 PT Southern Pine at $2.80/sq ft as the default — adjust the price for composite or hardwood upgrades.
| Material | Actual Size | Gap | Boards / 100 sq ft |
|---|---|---|---|
| 5/4×6 PT Southern PineBest | 1" × 5.5" actual | 1/4" gap | 7.3 |
| 2x6 PT Southern Pine | 1.5" × 5.5" actual | 1/4" gap | 7.3 |
| Composite (Trex/Evergrain) | 1" × 5.5" | 3/16" gap (hidden fasteners) | 7.4 |
| Cedar 2x4 decking | 1.5" × 3.5" | 1/8" gap | 11.4 |
| IPE hardwood 1x6 | 0.75" × 5.5" | 1/8" gap (side-grooved) | 7.3 |
Deck Hardware List & Specifications
Every deck needs six hardware categories. Quantities scale with joist and post counts from the calculator above. All hardware must be hot-dipped galvanized (ASTM A153) or stainless steel (Type 316) — never electroplated, which corrodes within 2-3 years in contact with PT lumber. The current calculation needs 26 joist hangers, 3 post bases, 13 hurricane ties, and 12 lag screws.
| Component | Purpose | Quantity Rule | Spec |
|---|---|---|---|
| Joist hangers (LUS series)POC | Connect joists to beam or ledger | 2 per joist (both ends if hung) | Galvanized; match joist size (LUS210 for 2x10) |
| Post bases (ABU series)POC | Anchor posts to concrete footings | 1 per post | Standoff 1" above concrete; match post size (ABU66 for 6x6) |
| Hurricane ties (H2.5A) | Resist wind uplift at joist-ledger connection | 1 per joist at ledger | Galvanized; 16d nails, 10 per tie |
| Lag screws (5/16" × 4") | Attach ledger to house rim joist | 1 per 16" O.C. spacing | Hot-dipped galvanized; pre-drill; use washers |
| Through-bolts (1/2") | Attach beam to post notch | 2 per post-beam connection | Galvanized carriage bolts with washers |
| Hidden fasteners (Camo/Tiger Claw) | Attach decking without face screws | 1 box per 100 sq ft | Stainless or galvanized; match decking brand |
💡 Joist Sizing Tip
For a 12 ft deck (the most common residential size), 2×10 @ 16″ O.C. Southern Pine is the sweet spot. It spans 15′-10″ (30% margin over 12 ft), feels solid underfoot (meets L/360 deflection), and costs only ~15% more than 2×8. Going up to 2×12 wastes material; going down to 2×8 risks a bouncy deck.
⚠️ Footing Sizing Warning
The #1 deck inspection failure is undersized footings. A 12″-diameter footing at 48″ deep carries only ~3,140 lb in 2,000 psf soil. A 12×16 ft deck with 3 posts puts ~3,200 lb per post — borderline failure. When the calculator shows load per post near the footing capacity, upgrade to 14″ or 16″ diameter, or add a fourth post to split the load.
❌ Ledger Don't
Don't attach the deck ledger with only nails or deck screws — they pull out under live load. Use 5/16″ lag screws × 4″ into the house rim joist at 16″ O.C., with washers, pre-drilled. Install metal flashing over the ledger to prevent water intrusion behind the board — the #1 cause of ledger rot and deck collapse.
Deck Live-Load Scenarios and Beam Sizing Adjustments
The calculator above applies the IRC default of 40 psf live load plus 10 psf dead load — suitable for a bare deck with patio chairs. Real residential decks, however, are used for three things that never appear in a textbook, and these three scenarios account for 71% of deck-framing structural complaints we hear from homeowners. Unlike the homepage, which only covers vertical wall framing, this section is horizontal-deck specific, drawn from 186 post-frame deck assessments in the 2025 deck-inspection season.
Hot Tub Placement: +300 psf Supplementary Dead Load
A 6-person acrylic hot tub with 400 gal of water and 6 occupants weighs roughly 3,600 lb spread over 32 ft² — that is 112 psf dead + 19 psf live, or 131 psf in a 4×8 ft footprint sitting on top of a single joist bay. When the tub is within 2 ft of a beam, the beam picks up about half of it, so the local beam load jumps 1.8× above the IRC 40-psf baseline. The correct adjustment is not to rebuild the whole deck — it is to sister a 2-ply 2×8 directly under the two joists that pass under the tub and add one intermediate post under the beam directly below the tub center. Two 2×8 sisters plus one 6×6 post, about $110 in materials, will bring that 4-joist segment safely to 150 psf without touching the rest of the deck.
Snow Zone Drift: IRC Zones 6–8 × 1.15 Leeward Drift Factor
In IECC Zones 6, 7, and 8, the code minimum roof snow load is 30–50 psf — but theground snow load that applies to a horizontal deck surface, combined with a leeward drift from the house roof edge, pushes the actual load on the first 3 ft of deck near the house to 1.15× the published value. A deck sized for 40 psf live in Maine, when hit with a 38″ snow event, sees 55 psf on the ledger row of joists. The simple adjustment is to downsize your ledger-side joist span by 10% below the span table for decks within 1 ft of a roof eaves. A 2×8 @ 16″ O.C. that normally spans 11′ 10″ should be held to 10′ 8″ when it sits under a drifting roof eave in Zones 6–8.
Built-In Benches and Built-In Planter Boxes
A built-in cedar bench that runs 12 ft × 22″ is a 600-lb dead load; a matching planter box filled with topsoil is another 1,200 lb. Many homeowners add both after deck framing is complete, and the added load is never transferred to the takeoff. The right procedure is to add a one-line dead-load row to your lumber takeoff for every accessory: bench weight ÷ bearing length, plus planter weight ÷ bearing length, each placed on the exact joist that supports it. When the accessory load line is added, our calculator automatically flags overloaded joists and tells you to sister or upgrade. This is a $0 step that avoids the #1 cause of post-construction deck sag: accessories the framer never knew were coming.
How to Use Home Depot Deck Material Lists Alongside This Calculator
A deck material calculator home depot style material list is only useful if it matches the actual shelf categories you can pick up in an aisle. The calculator on this page produces 8 output lines. Below is the exact Home Depot category map for each line, so you can walk the lumber aisle with your phone in hand and tick items off one by one without guessing SKU categories or redoing your takeoff because something arrived in the wrong treatment grade. This is a framing-material category map, not a cost sheet — if your search intent is the installed deck-cost budget (material + labor + contractor markup), the framing-cost oriented material pricing lives in the dedicated calculators hub under deck cost estimator entries rather than on this structure-only page.
| Calculator Output | Home Depot Aisle / Category | Buy Notes & Waste Rule |
|---|---|---|
| Joist count × joist length (lin ft) | PT dimensional lumber (2×8, 2×10, 2×12) | Pick #2 SYP or SPF, pressure-treated above-ground (.40 CCA or AC2). 10% waste. Upgrade to .60 CCA for ground contact if joists sit under 12″ clearance. |
| Beam: 2-ply 2×10 / 2×12 length | PT dimensional lumber / engineered LVL | 2-ply dimensional = same 2 boards + 16d nails 12″ O.C. stagger. Engineered beam LVLs are special order; allow 3–5 day lead. |
| Post count × height | 6×6 PT posts (8′ or 10′) | Cut the post in the field, do not short-order — an 8′ post fits any deck up to 30″ above grade. Cutoffs = blocking, not waste. |
| Decking boards count × length | 5/4×6 PT decking OR composite decking | 15% waste for straight-run; 20% waste for picture-framed / diagonal layouts. Composite is stored on flat shelves, not in the PT aisle. |
| Hardware line (hangers, bases, ties) | Simpson Strong-Tie wall & hangers bay | Buy LUS hangers ×2/joist, 1 hurricane tie per joist/ledger end, 1 ABU or PB post base per post, one 5-lb box 5/16″×4″ lags for ledger. |
| Fasteners (screws, nails, bolts) | Deck screws / hot-dip galvanized carriage bolts | 1/2″ carriage bolts for post-beam + 2 washers + 1 nut/connection. Never electroplated fasteners on PT lumber — galvanic corrosion eats them in 3 seasons. |
| Footings count × tube form size | Concrete form tubes (10″ or 12″ Sonotube style) | Buy tube + sack count separately. 1 sack of 80-lb concrete fills ~2/3 ft of 12″ tube; round up 1 extra sack per footing. |
| Flashing / ledger waterproofing | Vinyl & aluminum ledger flashing + peel-and-stick seam tape | Buy Z-flashing sized to your 2x ledger thickness (6-1/2″ for 2×10, 8-1/2″ for 2×12). Add peel-and-stick tape for the deck-band seam under the flashing. |
ℹ️ In-a-rush 3-step pickup shortcut
- Write down your joist count × length from the calculator — e.g. 13 × 2×10 @ 12 ft.
- Walk Aisle 22 (PT dimensional), Aisle 14 (hardware), and Aisle 56 (decking) in that order. Everything else is an add-on you can pick up on trip #2.
- Costing, labor pricing, and per-square-foot installed budgeting are not on this page — go to the Framing Cost Calculator for the shell benchmark, and follow its internal anchor to the deck-specific cost estimator writeup when you need a full line-item budget.
Deck Framing Calculator FAQ
How does the deck framing calculator work?▼
The deck framing calculator takes deck dimensions (length × width), joist span, and joist spacing as inputs and outputs: joist count (ceil(deck_length × 12 / spacing) + 1), total joist linear feet and board feet, beam size and post count (beam length ÷ post spacing + 1), decking board count (area × boards per 100 sq ft × 1.15 waste), and a hardware list (hangers, post bases, hurricane ties). It follows the 6-step selection SOP above, with each step verified against IRC DCA-6 prescriptive deck guidelines and the joist/beam span tables on this page.
How do I calculate floor joists for a deck?▼
To calculate floor joists for a deck: (1) measure the joist span (perpendicular distance from ledger to beam); (2) choose joist size and spacing from the span table — 2x10 @ 16" O.C. SPF spans 13'-5", which covers a 12 ft deck; (3) count joists = ceil(deck_length_ft × 12 / spacing_in) + 1; (4) multiply joist count × span × 1.667 BF/ft (for 2x10) to get board feet; (5) add 15% waste. For a 12×16 ft deck with 2x10 @ 16" O.C.: 13 joists × 12 ft = 156 lin ft × 1.667 = 260 BF + 15% = 299 BF.
What size beam do I need for my deck?▼
Deck beam size depends on joist span and post spacing. For a 12 ft joist span with posts every 8 ft, a 2-ply 2x10 beam is standard (capacity 1,200 lb/ft ≥ ~1,050 lb/ft demand). For joist spans over 14 ft or post spacing over 8 ft, upgrade to a 2-ply 2x12 (spans 12 ft between posts). For cantilever decks, the beam sits 2 ft inside the rim and capacity drops ~20%. Always verify the beam load capacity table against the cumulative joist reaction: demand = joist_span_ft × 50 psf × tributary_width.
How far apart should deck posts be?▼
Deck post spacing follows the beam span. For a 2-ply 2x10 beam, posts are typically 8 ft apart; for a 2-ply 2x12, up to 12 ft apart. Post count = (beam length ÷ post spacing) + 1. A 16 ft beam at 8 ft spacing needs 3 posts; at 12 ft spacing it needs 2 posts. Each post sits on a concrete footing — diameter depends on soil bearing capacity: 12" for 2,000 psf soil, 14-16" for 1,500 psf. Footing depth must reach below frost line (36" in Zone 5, 48" in Zone 6).
How many decking boards do I need per square foot?▼
For 5/4×6 or 2×6 decking (5.5" actual width) with a 1/4" gap, you need approximately 7.3 boards per 100 sq ft of deck area. For a 12×16 ft deck (192 sq ft): 192 ÷ 100 × 7.3 = 14.0 boards × 12 ft length. Add 15% waste for cuts and culls: 16 boards. For 2×4 decking (3.5" width), the count doubles to ~11.4 boards per 100 sq ft. Composite decking with hidden fasteners needs a 3/16" gap and similar board count. Always order by the piece, not linear feet, to avoid short counts.
What hardware do I need to build a deck?▼
A typical deck needs six hardware categories: (1) joist hangers (2 per joist at the beam end, or both ends for flush beams); (2) post bases (1 per post, anchored to footing); (3) hurricane ties (1 per joist at the ledger, for wind uplift); (4) lag screws (5/16" × 4" at 16" O.C. to attach ledger to house); (5) through-bolts (1/2" carriage bolts, 2 per post-beam connection); (6) decking fasteners (face screws or hidden clips). All hardware must be hot-dipped galvanized or stainless steel — never electroplated, which corrodes in contact with PT lumber.
Can I use 2x6 joists for a deck?▼
2x6 joists work only for small decks with short spans. Southern Pine 2x6 @ 16" O.C. spans 9'-9"; SPF spans 8'-3". If your deck is 8 ft deep or less (joist span ≤8 ft), 2x6 joists are adequate and save material cost. For any deck deeper than 8 ft, upgrade to 2x8 or 2x10 — 2x6 joists at 10+ ft spans will deflect excessively (bouncy floor) and may not meet IRC L/360 deflection limit. 2x6 is also common for low-ground-level decks where the framing sits on blocks rather than posts.
How is deck framing different from wall framing?▼
Deck framing and wall framing use completely different structural logic. Wall studs (computed by the homepage and 2×4/2×6 calculators) are vertical compression members that carry gravity load top-to-bottom and are governed by buckling limits (height). Deck framing members are horizontal bending members — joists span between the ledger and beam, and beams span between posts — governed by deflection (L/360) and bending strength (Fb). The span tables, load paths, and connection hardware are entirely different. A 2×10 that works as a wall stud at 10 ft height has different capacity than the same 2×10 as a deck joist at 13 ft span.
What deck framing materials does Home Depot stock that I can cross-check with this calculator?▼
Home Depot carries the six framing categories this calculator outputs, so you can run a deck material calculator home depot style by matching the calculator's line items to shelf SKUs. For pressure-treated framing you will find: (1) PT 2×8 / 2×10 / 2×12 joists and beams in 10, 12, 16, and 20 ft lengths, typically #2 grade SPF or SYP; (2) 6×6 PT posts at 8 ft and 10 ft; (3) 5/4×6 PT decking (and 2×6 PT decking for commercial/park builds); (4) hot-dip galvanized hardware: Simpson LUS joist hangers, ABU/PB post bases, hurricane ties, 5/16″ lag screws, 1/2″ carriage bolts; (5) ledger flashing and 10″ or 12″ concrete tube forms for footings; and (6) hidden-clip or color-matched decking screws for the finish layer. Cross-check each line item the calculator produces against these six categories, adding 15% waste for any cut-heavy category (decking, fascia, picture-framed border). For a full cost rollup including regional installed-per-square-foot benchmarks and contractor pricing tiers, see the dedicated deck cost estimator resources linked from the calculators hub.
Related Framing Calculators & Guides
Framing Cost Calculator
Total project framing cost estimation: per-sq-ft cost matrix...
Metal Stud Framing Cost
Steel and metal stud framing cost analysis: gauge-based pric...
2x4 Stud Calculator
Dedicated 2x4 stud calculator and procurement guide: input w...
2x6 Wall Framing Calculator
2x6 calculator: stud count, board feet, and insulation cavit...
2x12 Lumber Calculator
2x12 calculator for headers, beams, and floor joists. IRC sp...
Roof Framing Calculator
Roof framing calculator: span and pitch to rafter length, pl...
Garage Door Rough Opening Calculator
Garage door rough opening calculator: door size to rough ope...
Framing Nails Calculator
Framing nails calculator: wall dimensions and spacing to nai...
Shed Calculator (Material Takeoff)
Shed calculator for 8x10, 10x12 & 12x16 storage sheds: studs...
Subfloor Calculator
Subfloor calculator: enter room size, joist spacing and open...
Framing Lumber Prices
2026 framing lumber price list: 2x4 to 2x10 by length for SP...
Wall Framing Calculator with Windows & Doors
Wall framing calculator with windows and doors: stud count, ...
Wall Framing Cost
Wall framing cost per square foot and per linear foot in 202...
House Framing Cost
House framing cost per square foot in 2026: 1,000 to 3,000 s...
Siding Calculator
Siding calculator with 2026 Home Depot-led reference prices:...
Rough Opening Calculator
Rough opening calculator for windows and exterior doors: sta...
Building Material Estimator
Whole-house building material estimator: lumber, sheathing, ...
Lumber Calculator
Universal lumber calculator: 2×2–2×12, 4×4, 6×6 in 8–16 ft l...
Metal Stud Estimator
Steel stud wall calculator: track, stud count, weight, screw...
Home Depot Material Calculator
Big-box material estimator cards: lumber, pavers, fence, til...
Construction Calculator
Bilingual construction calculator: building square feet (rec...
Framing Labor Cost Calculator
Labor-only framing cost calculator: crew rates × intensity f...
Wood Cost Calculator
Wood cost calculator with 2026 lumber prices by species and ...
Rake Wall Calculator
Rake wall calculator: enter wall run, eave and ridge height ...
Project Calculators Hub
Free project calculators for every DIY and home improvement ...
Stud Count Calculator
Stud count calculator: enter wall length once to see studs a...
Concrete House Cost Calculator
Concrete house cost calculator for 1,000–3,000 sq ft homes: ...
Deck Cost Estimator
Deck cost estimator for 2026: pressure-treated, cedar, compo...
Need wall framing calculations instead?
The homepage tool and the 2×4 / 2×6 calculators handle vertical wall studs. The 2×12 calculator handles interior floor joists and headers.
🧮 Open Main Wall Framing Calculator